HAFO MOULD

Quality & Inspection

Anyone can write "high quality" on a website. What a buyer actually needs is evidence: a certificate whose scope you can read, measuring equipment you can see, an inspection process you can follow, and a report in your hands before the goods ship. This page

sets out exactly how quality works at HAFO Mould — what we are certified for (and, just as importantly, what the certificate does and does not cover), what we measure, when we measure it, and which documents you can request with any order, from a 1-piece CNC prototype to a molding production run.

Engineer measuring a large aluminum housing on a gantry CMM at HAFO Mould
iso-certificate

CERTIFICATION

Our Certification — Stated Precisely

HAFO Mould's quality management system is certified to ISO 9001:2015 (GB/T 19001-2016). Certificate No.: 64625Q02009R000. Certification body: ZhongRen HeZong Certification (Shenzhen).

Certified scope: "Manufacturing of Hardware Molds and Parts". Validity: certificate current, valid to 26 December 2028 (subject to scheduled surveillance audits). We publish the scope in full because it matters.

We do not claim certifications we do not hold

if your project requires a sector-specific standard or documentation package, tell us in the RFQ and we will tell you plainly what we can and cannot support, before you commit.

Inspection Equipment

Our inspection room is equipped for the tolerances we quote:

011

3 fully automatic CMMs

Coordinate measuring machines — programmable measurement of dimensions, positions and geometry against your drawing, including features that sit on several planes. The inspection room's Brown & Sharpe CMM is shown in the photo on this page.

022

Drawing-based dimensional inspection

Critical dimensions checked and recorded against the tolerances on your 2D drawing or model.

033

Material verification

Material certificates collected and supplied with orders on request, so the grade on the drawing is the grade in the box.

044

Surface treatment verification

Finish certificates available for anodizing, plating and other treatments supplied with your parts.

Worker inspecting black molded parts at a bench in HAFO's quality department

INSPECTION

What Gets Checked — and When

Equipment only counts if it is used on your parts, at the right moments. That is the next section. 1. First article inspection (FAI). The first completed part of a job is measured against the drawing before the run continues.

For CNC work, the dimensions you marked as critical are checked and recorded; an FAI report is available on request. Catching a deviation on part one is cheap. Catching it after packing is not. 2. In-process checks.

Glass inspection room with CMM at HAFO Mould

INSPECTION

Final Inspection Before Packing

3. Final inspection before packing. Finished parts are checked against the drawing before they are packed: dimensions, threads, finish and appearance. Parts that fail are separated, not shipped and argued about later.

Pre-shipment photos or video

Pre-shipment photos or video of your actual parts are available on request, so you can see what is coming before it leaves Dongguan.

A note on critical dimensions

inspection is most valuable where your assembly is least forgiving. Mark the dimensions, fits and surfaces that matter on your drawing — bearing seats, sealing faces, mating interfaces — and those are the values that get measured, recorded and reported.

General tolerance

Unmarked dimensions are produced and checked to the general tolerance of ISO 2768-mK.

Reports You Can Request

Any of the following can be supplied with your order — just ask in the RFQ so inspection time is planned into the quote:

011

CMM inspection report

Measured values from our fully automatic CMMs against your drawing dimensions

022

Dimensional inspection report

Recorded checks of the dimensions that matter to your assembly

033

Material certificate

Grade documentation for the metal or plastic your parts were made from

044

Surface treatment certificate

Documentation for anodizing, plating and other finishes applied to your parts

055

First Article Inspection (FAI) report

Full first-part verification before a run proceeds

066

Pre-shipment photos or video

Your actual parts, on our bench, before packing

077

PPAP packages for automotive programs, on request

How Quality Connects to Your Order

Quality at HAFO is not a department that appears at the end; it is wired into the same flow as your quote and production:

11

RFQ and free DFM review

Tolerance callouts are reviewed before we quote — including the honest conversation about which dimensions genuinely need precision (±0.025 mm / ±0.001 in on metal where marked) and which are paying for accuracy they never use. This is where report requirements are agreed too.

22

Production

Parts are machined, turned or molded in our own factory — the inspection room serves the same building, not a subcontractor across town.

CNC Machined Parts · CNC Turning Parts · Custom Injection Molded Parts
33

Inspection and reporting

First article, in-process and final checks are performed as described above; requested reports are compiled with the job.

44

Packing and shipping

Parts are packed after final inspection and shipped on DDP, EXW or FOB terms to customers worldwide.

Because the factory, the toolroom and the inspection room are one company

Haifu Mould Industry Limited, operating as HAFO Mould, in Dongguan since 2007 — a measurement problem found at final inspection goes straight back to the people who made the part, while there is still time to act on it.

FAQ

See our tolerance guide CNC Machining Tolerances Explained: Standard vs. Precision for how to specify them sensibly.

Ordering parts that this system will inspect?

Upload your drawing for a free DFM review and a quote within 24 hours — and tell us which reports you want with the order. Parts are produced across our factory in Dongguan — see the machines and the inspection room for yourself on the Our Factory & Equipment page.